Home Page

Special Features

Facebook Page

YouTube Channel

Advertise

Contact Us

Site Map

 

Menu

The Early Years

Planning the Tunnel

Construction

Opening the Tunnel

Current Operations

Facts and Figures

The Channel Tunnel Story - Facts and Figures

  • The 2 main rail tunnels are 7.6 metres in diameter



  • The service tunnel is 4.8 metres in diameter



  • Each tunnel is 50km in length



  • Journey time from platform to platform is 35 minutes



  • 200km of track make up the tunnel system, 100 of which are in the tunnel



  • 950km of cable are used to power the locomotives, 15,000 supports carry the cables



  • 38 locomotives are used in the running of the tunnel